Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Turn off Animations
Turn on Animations

ΕΠΙΧΕΙΡΗΣΙΑΚΟ ΠΡΟΓΡΑΜΜΑ

"MΕΤΑΡΡΥΘΜΙΣΗ ΔΗΜΟΣΙΟΥ ΤΟΜΕΑ"

  • A
  • A
  • A
EN | EL

Εθνόσημο

ΥΠΟΥΡΓΕΙΟ ΑΝΑΠΤΥΞΗΣ & ΕΠΕΝΔΥΣΕΩΝ

ΕΙΔΙΚΗ ΓΡΑΜΜΑΤΕΙΑ ΔΙΑΧΕΙΡΙΣΗΣ ΠΡΟΓΡΑΜΜΑΤΩΝ ΕΚΤ

CONTACT

4 Korai str (6th floor). GR-105 64, Athens
+30 213 2018000
+30 213 2018037
epdm@mou.gr
IQ Net Certificate
  • NEWS
  • PROPOSALS
  • TENDERS

  • Home page >
  • eLibrary

eLibrary

  • Share
  • Print page

Guide on Procedures for the Preparation of Port and Harbour Projects (June 2014)

Publication date: 1/6/2014

A technical guide similar to the one regarding the maturation of leisure harbour projects, which identifies, in detail, all the maturation actions (studies, surveys, licensing) for a typical port development project.

The manual also includes:

  • the time-table foreseen for individual activities
  • the competent authorities for each activity
  • related legislation and
  • the estimated time-table for completing these activities.

The manual is only available in Greek and it revises the one published by the MOU in 2009.

Programme PP 2014-2020 , Interreg V-A Greece - Bulgaria , Interreg V-A Greece - Cyprus , Interreg V-A Greece - Italy , Interreg IPA CBC Programme Greece – Albania 2014- 2020 , Interreg IPA CBC Programme Greece – the former Yugoslav Republic of Macedonia 2014- 2020 , Interreg V-B Balkan - Mediterranean
Category Tools
Area of interest Public administration
Document type Guide on Maturation Procedures
Publisher Management Organisation Unit of Development Programmes (MOU SA)
  • PDF (9.83 Mb)

Last modification date: 27/7/2015

Return to results
  • Site Map
  • Terms of Use
  • Accessibility
Co-financed by Greece and the European Union for the Operational Programme «REFORM OF THE PUBLIC SECTOR»
© Copyright w3c